
Heavy civil estimating · built from the plans
Price more work.
Miss less scope.
Turn a plan set into editable quantities, crews, materials, equipment, schedules and bid-ready exports—without rebuilding the job in five different tools.
No sales call · Sample project included · Your estimates stay private
The estimate is the evidence
See every number. Change every assumption.
AI starts the work. Your estimator stays in control of quantities, production, labor, equipment, materials, indirects and final bid structure.
LABOR
$84.2K
MATERIAL
$106.4K
EQUIPMENT
$37.7K
One connected bid workflow
From drawing sheet to bid day.
Read the plans
Upload the drawing set. AI identifies scope and connects quantities to the source sheet.
Build the estimate
Review separate labor, material and equipment costs. Change any assumption or rate.
Pressure-test the bid
Run scope checks, compare production, group pay items and review risk before export.
Schedule and submit
Build a 4×10 CPM schedule and export bid, agency and accounting-ready files.
01 / SITE UTILITIES
Pipe scope tied back to the drawing.
Measure water, sewer, storm, power and gas. Every line item keeps its drawing page, location and highlighted source geometry close at hand.
- Pipe, structures and appurtenances
- Crew and equipment predictions
- Drawing-linked review queue
LABOR
$84.2K
MATERIAL
$106.4K
EQUIPMENT
$37.7K
02 / SITE WORK
Turn dirt into production, not guesswork.
Build cut/fill quantities, haul assumptions and dirt-work crews separately from utility pricing, then see combined-award savings only when scopes come together.
- Grid cut/fill and haul tools
- Owned and rented equipment
- Production-rate driven labor
CUT
8,420 CY
FILL
8,170 CY
03 / CONCRETE + DEMOLITION
Different work. Separate resources. One bid.
Estimate concrete and demolition with their own labor, materials and equipment—without contaminating the original utility estimate.
- Dedicated trade libraries
- Independent crews and fleets
- Combined overall estimate
SITE CONCRETE
14 ITEMS · SEPARATE RESOURCES
DEMOLITION
9 ITEMS · SEPARATE RESOURCES
SITE UTILITIES
32 ITEMS · SEPARATE RESOURCES
Private by default
Projects and company libraries stay scoped to your account.
Built for a 4×10 week
Labor hours and production rates feed an efficient CPM schedule.
Made for self-perform work
Utilities, dirt, concrete and demolition stay separate until you combine them.
Pricing without the sales maze
Start with real work. Scale when it pays.
Pay per project
Two project uploads free for new signups.
- Sample project with the full workflow
- AI plan reading up to 10MB
- Calibrated tracing and measurement
- Bid sheets and exports
Annual
Built for teams pricing work every week.
- Unlimited projects
- Full libraries and assemblies for the first annual term
- Full product support
- Everything in pay per project
Full library
Add the full estimating library to pay-per-project access.
- Equipment, labor and CSI items
- Expanded assemblies
- Private company edits
- No recurring library charge
Your next estimate